<ins id="vdrt5"><span id="vdrt5"></span></ins>
<ins id="vdrt5"></ins>
<del id="vdrt5"></del>
<ins id="vdrt5"></ins><del id="vdrt5"></del><ins id="vdrt5"></ins>
<cite id="vdrt5"><span id="vdrt5"></span></cite>
<ins id="vdrt5"><noframes id="vdrt5"><ins id="vdrt5"></ins>
<del id="vdrt5"><span id="vdrt5"></span></del>
<ins id="vdrt5"><noframes id="vdrt5"><cite id="vdrt5"></cite>
<cite id="vdrt5"><span id="vdrt5"></span></cite><ins id="vdrt5"></ins>
<ins id="vdrt5"></ins><cite id="vdrt5"><span id="vdrt5"></span></cite>
<del id="vdrt5"></del>

Tappan Zee Girder Alignment Mechanism
Projects -Tappan Zee Girder Alignment Mechanism

Tappan Zee Girder Alignment Mechanism

In anticipation of the erection of the approach span’s steel girders, Tappan Zee Constructors (TZC) required the fabrication of Girder Alignment Mechanisms. TZC awarded a contract to County Fabricators for the fabrication of three complete units. These units are to be used to assist in the erection and proper alignment of the 12′ tall x 350’+/- long sub-assembled bridge girders. This is a precise and precision assembly made to very strict tolerances.

大看蕉a在线观看